1 00:00:00,302 --> 00:00:04,312 Open Projects to organise customer delivery responsibilities and 2 00:00:04,325 --> 00:00:09,549 time in one place This walkthrough uses a fictional onboarding project 3 00:00:10,447 --> 00:00:14,731 We will create its milestones and tasks review files and discussions 4 00:00:14,953 --> 00:00:19,731 track time and prepare draft billing Each chapter shows the actual 5 00:00:19,744 --> 00:00:23,976 controls and the saved result Begin with New Project 6 00:00:36,035 --> 00:00:40,399 Enter a clear project name and select the customer Keep Calculate 7 00:00:40,412 --> 00:00:43,758 progress through tasks selected when completion should follow task 8 00:00:43,771 --> 00:00:49,488 status Review the billing choices Fixed Rate Project Hours and Task 9 00:00:49,501 --> 00:00:54,592 Hours This example uses Task Hours so eligible task time can be 10 00:00:54,605 --> 00:00:59,240 reviewed for draft invoicing later Select the starting status and 11 00:00:59,253 --> 00:01:00,347 estimated hours 12 00:01:08,826 --> 00:01:11,899 Review Members and retain the authorised colleague who will deliver 13 00:01:11,912 --> 00:01:17,357 the work Set the start date and deadline add a useful tag then describe 14 00:01:17,370 --> 00:01:21,654 the scope James Bennett is the only staff member in this training 15 00:01:21,667 --> 00:01:26,953 workspace Keep the project-created email off while preparing demonstration 16 00:01:26,966 --> 00:01:31,784 records Project visibility and contact notifications are reviewed 17 00:01:31,797 --> 00:01:33,555 separately in Project Settings 18 00:01:47,335 --> 00:01:52,194 Open Project Settings before saving Send contacts notifications 19 00:01:52,207 --> 00:01:56,113 controls project updates choose Do not send notifications for this 20 00:01:56,126 --> 00:02:01,334 training example Visible Tabs controls the available project sections 21 00:02:02,233 --> 00:02:05,709 The checkboxes below govern what customer contacts can view and 22 00:02:05,722 --> 00:02:10,501 do Match these permissions to the agreed client access including 23 00:02:10,514 --> 00:02:15,358 tasks files discussions timesheets and financial information 24 00:02:28,938 --> 00:02:33,354 Use More and Edit Project to reopen the saved settings Check the 25 00:02:33,367 --> 00:02:38,302 customer billing method dates and members The date fields in this 26 00:02:38,315 --> 00:02:43,667 workspace use year month and day Update the estimated hours then 27 00:02:43,680 --> 00:02:49,070 review Project Settings Contact notifications remain off and customer 28 00:02:49,083 --> 00:02:53,940 access to finance and timesheets is disabled in this example Save 29 00:02:53,953 --> 00:02:55,594 and check the updated overview 30 00:03:18,436 --> 00:03:22,459 The overview brings the project dates billing method estimated hours 31 00:03:22,564 --> 00:03:27,149 and progress together Progress is calculated through tasks in this 32 00:03:27,162 --> 00:03:32,930 project Review open tasks remaining days logged time and expenses 33 00:03:33,165 --> 00:03:37,540 then use the chart menu to change the reporting period Billable 34 00:03:37,761 --> 00:03:42,331 billed and unbilled figures describe different states These training 35 00:03:42,344 --> 00:03:44,649 totals do not represent money received 36 00:03:48,436 --> 00:03:53,425 In Milestones choose New Milestone Give the delivery stage a clear 37 00:03:53,438 --> 00:03:58,321 name then set its start and due dates Add a useful description and 38 00:03:58,334 --> 00:04:02,813 review its customer visibility Show description to customer controls 39 00:04:02,826 --> 00:04:06,485 the description Hide from customer controls the milestone itself 40 00:04:07,383 --> 00:04:11,016 Set an order save and check the milestone on the project 41 00:04:36,470 --> 00:04:40,207 Reload the project and check the saved milestone name and date range 42 00:04:41,108 --> 00:04:45,925 Select the milestone heading to edit it Review the dates description 43 00:04:46,147 --> 00:04:50,821 customer visibility and order Update the description choose Save 44 00:04:50,834 --> 00:04:55,209 and reopen the project to confirm the change This checks the stored 45 00:04:55,222 --> 00:04:57,970 result rather than relying only on the save message 46 00:05:05,404 --> 00:05:08,594 Add a second milestone for the delivery review and give it the next 47 00:05:08,607 --> 00:05:13,036 order This stage starts after the client brief and ends at the project 48 00:05:13,049 --> 00:05:18,909 deadline Select Hide from customer for an internal-only stage Save 49 00:05:18,922 --> 00:05:23,661 and reload the project to confirm both stages Milestone visibility 50 00:05:23,674 --> 00:05:26,930 is separate from staff membership and the customer’s general portal 51 00:05:26,943 --> 00:05:27,607 permissions 52 00:05:57,804 --> 00:06:02,676 Open the project’s Tasks tab and choose New Task Enter a specific 53 00:06:02,689 --> 00:06:06,400 subject review Billable and Visible to customer and keep Public 54 00:06:06,413 --> 00:06:10,593 off when the task should follow normal staff visibility Set the 55 00:06:10,606 --> 00:06:15,202 illustrative hourly rate milestone start date due date and priority 56 00:06:16,100 --> 00:06:19,968 This example uses a training rate of seventy-five pounds saving 57 00:06:19,981 --> 00:06:21,921 a task does not charge the customer 58 00:06:48,909 --> 00:06:53,833 Review Related To and confirm the project Assignees identifies who 59 00:06:53,846 --> 00:06:57,791 will deliver the task Followers identifies who follows its updates 60 00:06:58,690 --> 00:07:02,531 James Bennett is the available colleague in this demonstration workspace 61 00:07:03,429 --> 00:07:08,312 Add a useful tag and a clear description then choose Save Reopen 62 00:07:08,325 --> 00:07:12,062 the task from the project list to check that its details and responsibility 63 00:07:12,075 --> 00:07:12,791 were stored 64 00:07:49,803 --> 00:07:53,540 Close the task profile and reopen it from the project’s task list 65 00:07:54,441 --> 00:07:59,792 Check the subject project milestone dates priority and hourly rate 66 00:08:00,691 --> 00:08:03,933 Review the description and the assignee and follower selections 67 00:08:04,831 --> 00:08:09,336 The task is billable but has not been billed These controls keep 68 00:08:09,349 --> 00:08:13,177 the task’s saved details separate from later time tracking and invoice 69 00:08:13,191 --> 00:08:13,946 preparation 70 00:08:17,803 --> 00:08:22,675 Use Checklists and handover to group the task’s delivery steps Under 71 00:08:22,688 --> 00:08:26,256 Add a checklist enter a clear checklist name and choose its owner 72 00:08:27,154 --> 00:08:30,930 Select an authorised colleague or Task assignees when ownership 73 00:08:30,943 --> 00:08:34,836 should follow the task assignment Add the checklist and check that 74 00:08:34,849 --> 00:08:39,407 it appears in the workflow This example assigns Brief preparation 75 00:08:39,420 --> 00:08:40,396 to James Bennett 76 00:08:46,438 --> 00:08:49,980 Enter a specific step under the named checklist and choose Add item 77 00:08:50,880 --> 00:08:54,682 Add the remaining steps one at a time checking each saved label 78 00:08:55,581 --> 00:08:59,083 Leave the completion boxes clear until the work is actually done 79 00:08:59,982 --> 00:09:03,575 Here the training brief still needs to be attached so that step 80 00:09:03,589 --> 00:09:07,807 remains incomplete The checklist owner and progress appear with 81 00:09:07,820 --> 00:09:08,315 the group 82 00:09:15,971 --> 00:09:21,012 Add a second named checklist for Delivery sign- off Choose Task assignees 83 00:09:21,025 --> 00:09:24,866 when ownership should follow the assigned delivery colleague Keep 84 00:09:24,879 --> 00:09:27,861 preparation and sign-off as separate groups so their owners and 85 00:09:27,874 --> 00:09:32,809 progress remain clear After adding the stage review its steps before 86 00:09:32,822 --> 00:09:37,236 enabling an ordered handover Saving a group does not mean its work 87 00:09:37,249 --> 00:09:37,978 is complete 88 00:09:44,271 --> 00:09:47,682 Open Delivery sign-off and add the review step that must be completed 89 00:09:47,695 --> 00:09:52,060 after preparation Use a clear action so the owner can verify the 90 00:09:52,073 --> 00:09:56,747 result The example asks for a review of the attached demonstration 91 00:09:56,760 --> 00:10:01,096 brief The step remains incomplete until the file and its content 92 00:10:01,109 --> 00:10:01,890 have been checked 93 00:10:09,505 --> 00:10:14,025 Open Workflow settings Complete these checklists in order makes 94 00:10:14,038 --> 00:10:18,517 the next stage ready after the preceding stage is completed Finish 95 00:10:18,531 --> 00:10:21,968 every checklist before completing the task keeps checklist completion 96 00:10:21,981 --> 00:10:26,356 separate from the final task status Select the rules needed for 97 00:10:26,369 --> 00:10:31,096 this workflow and choose Save settings Close and reopen the task 98 00:10:31,109 --> 00:10:33,179 to verify both saved selections 99 00:10:39,505 --> 00:10:44,234 Use the task’s upload area to attach the supporting document Choose 100 00:10:44,247 --> 00:10:48,791 the intended file and wait for the upload to finish This is a fictional 101 00:10:48,804 --> 00:10:53,583 training brief not a customer agreement or receipt Close and reopen 102 00:10:53,596 --> 00:10:58,218 the task to check that the filename was stored Review task and customer 103 00:10:58,231 --> 00:11:03,296 visibility before uploading real documents We will verify the downloaded 104 00:11:03,309 --> 00:11:06,213 content before completing the attachment checklist step 105 00:11:12,740 --> 00:11:17,208 Select the saved filename to download the task attachment Check 106 00:11:17,221 --> 00:11:20,542 the filename and open the downloaded document in your normal review 107 00:11:20,555 --> 00:11:25,203 process before relying on it This training download is checked against 108 00:11:25,216 --> 00:11:29,682 the original demonstration brief Only after that verification should 109 00:11:29,695 --> 00:11:33,914 the attachment checklist step be completed Review the recipient 110 00:11:33,927 --> 00:11:36,570 and access scope before sharing real documents 111 00:11:41,673 --> 00:11:45,137 Use Edit on the checklist to clarify its name or review its owner 112 00:11:46,037 --> 00:11:49,644 This example changes the name to Brief preparation and checks while 113 00:11:49,657 --> 00:11:54,006 retaining James Bennett as the owner Save the change and confirm 114 00:11:54,019 --> 00:11:57,977 the updated heading Editing the checklist does not complete its 115 00:11:57,990 --> 00:12:00,165 steps or change the task’s billed state 116 00:12:08,235 --> 00:12:12,651 Use Move up or Move down to change the stage order With ordered 117 00:12:12,664 --> 00:12:16,596 completion enabled this order determines which stage is ready first 118 00:12:17,495 --> 00:12:20,958 We will move Delivery sign-off up to demonstrate the control then 119 00:12:20,971 --> 00:12:25,268 restore it after preparation Check the final headings and Ready 120 00:12:25,281 --> 00:12:27,990 or Waiting indicators before continuing the work 121 00:12:34,472 --> 00:12:39,253 Open Reuse a checklist workflow Enter a clear template name and 122 00:12:39,266 --> 00:12:43,680 choose Save as template The template keeps the checklist structure 123 00:12:43,992 --> 00:12:48,888 owners and order for another task Completed work is reset when the 124 00:12:48,901 --> 00:12:53,120 template is used so a new task does not inherit completed checks 125 00:12:54,018 --> 00:12:57,781 Close and reopen the task to verify the saved template before applying 126 00:12:57,794 --> 00:12:58,458 it elsewhere 127 00:13:04,373 --> 00:13:09,180 Open the task’s three-dot Actions menu and choose Copy Review which 128 00:13:09,193 --> 00:13:13,529 assignees followers checklist items and attachments should be copied 129 00:13:13,750 --> 00:13:18,555 then select the new task’s starting status Available options depend 130 00:13:18,568 --> 00:13:23,151 on the source task Here we retain the assignee and follower leave 131 00:13:23,164 --> 00:13:27,904 attachment copying off and select Not Started Choose Confirm once 132 00:13:27,917 --> 00:13:29,961 and check the new task identifier 133 00:13:33,820 --> 00:13:37,375 The copy inherits the original subject so use Actions and Edit to 134 00:13:37,388 --> 00:13:41,830 give it a distinct name This example becomes Review demonstration 135 00:13:41,843 --> 00:13:46,153 delivery Move it to the internal delivery-review milestone and set 136 00:13:46,166 --> 00:13:50,593 its own dates and priority Turn off Billable and Visible to customer 137 00:13:50,606 --> 00:13:55,267 for this internal training task Save and check the updated record 138 00:13:55,280 --> 00:13:57,221 while preserving the original task 139 00:14:36,673 --> 00:14:40,488 Copying the previous task also retained its grouped checklist structure 140 00:14:41,389 --> 00:14:45,139 Use template is available on a task without grouped checklists so 141 00:14:45,152 --> 00:14:49,748 create a fresh task for this example Give it a distinct subject 142 00:14:49,956 --> 00:14:54,618 review its project milestone dates and assignee and keep it nonbillable 143 00:14:54,631 --> 00:14:58,797 and hidden from the customer Save the task before applying the stored 144 00:14:58,810 --> 00:14:59,982 checklist workflow 145 00:16:00,373 --> 00:16:05,805 On the fresh task open Reuse a checklist workflow Select the saved 146 00:16:05,818 --> 00:16:10,688 onboarding template and choose Use template Review the copied checklist 147 00:16:10,701 --> 00:16:15,844 names owners order and unfinished steps The template provides a 148 00:16:15,857 --> 00:16:19,307 starting structure it does not mean the work has been completed 149 00:16:20,206 --> 00:16:23,539 Close and reopen the task to check that the workflow and its settings 150 00:16:23,552 --> 00:16:24,229 were stored 151 00:16:29,774 --> 00:16:33,094 Open Task order and select the task that must finish before this 152 00:16:33,107 --> 00:16:38,266 one can start Here the delivery review depends on Prepare onboarding 153 00:16:38,279 --> 00:16:43,292 checklist Leave the other task unselected and choose Save task order 154 00:16:44,190 --> 00:16:49,177 Close and reopen the task to verify the selection Task order controls 155 00:16:49,190 --> 00:16:53,057 prerequisites between tasks ordered checklists control the stages 156 00:16:53,070 --> 00:16:54,242 inside a task 157 00:16:58,674 --> 00:17:03,077 Open the task you are working on and choose Start Timer The timer 158 00:17:03,090 --> 00:17:07,452 belongs to this task and the signed-in staff member Let it run while 159 00:17:07,465 --> 00:17:11,905 reviewing the task details This is a short training demonstration 160 00:17:12,192 --> 00:17:16,749 not a record of chargeable work Check the task and any prerequisite 161 00:17:16,762 --> 00:17:19,483 rules before starting a timer on real delivery 162 00:17:27,145 --> 00:17:30,817 Choose the running timer’s stop control add a useful note and save 163 00:17:30,830 --> 00:17:35,832 it Confirm the task returns to Start Timer then open Timesheets 164 00:17:35,845 --> 00:17:40,845 to review the recorded start end and duration Stopping a timer stores 165 00:17:40,858 --> 00:17:45,506 time it does not send an invoice or take a payment Review billing 166 00:17:45,519 --> 00:17:48,775 eligibility separately before using the entry for an invoice 167 00:17:56,007 --> 00:17:59,835 Use the edit icon on the recorded timesheet row to inspect its start 168 00:18:00,043 --> 00:18:04,525 end member and note The note entered when stopping the timer is 169 00:18:04,538 --> 00:18:09,512 retained here Review the details then choose Cancel when no change 170 00:18:09,525 --> 00:18:14,434 is required This keeps the original timer entry intact while confirming 171 00:18:14,447 --> 00:18:16,009 the information that was stored 172 00:18:30,841 --> 00:18:35,648 Under Add timesheet choose Enter time duration instead Enter the 173 00:18:35,661 --> 00:18:40,426 duration select the authorised member and add a specific note This 174 00:18:40,439 --> 00:18:43,747 fictional example uses thirty minutes solely to demonstrate the 175 00:18:43,760 --> 00:18:48,838 form Save once then open the new row to verify its stored note and 176 00:18:48,851 --> 00:18:53,799 time For real delivery enter only the time actually worked and review 177 00:18:53,812 --> 00:18:55,361 billing eligibility separately 178 00:18:57,208 --> 00:19:01,754 Choose Save to store the manual entry Reopen Timesheets if the panel 179 00:19:01,767 --> 00:19:05,582 has closed then use the new row’s edit icon to review its dates 180 00:19:05,687 --> 00:19:10,257 member and note Confirm the stored training details and cancel the 181 00:19:10,270 --> 00:19:14,489 review when no further change is needed Check the duration in the 182 00:19:14,502 --> 00:19:17,379 table before including time in any draft invoice 183 00:19:31,208 --> 00:19:36,210 Choose Edit on the manual training entry Review the start end member 184 00:19:36,223 --> 00:19:40,533 and note before saving a correction This example is changed to a 185 00:19:40,546 --> 00:19:43,853 clearly labelled fictional forty-five-minute entry from nine to 186 00:19:43,866 --> 00:19:49,101 nine forty-five Save reopen the row and verify the stored times 187 00:19:49,114 --> 00:19:53,658 and note Check the table’s duration and confirm the original timer 188 00:19:53,671 --> 00:19:55,247 entry remains unchanged 189 00:20:11,708 --> 00:20:16,580 Review the timesheet row before using Delete This example removes 190 00:20:16,593 --> 00:20:19,679 only the short timer recorded for the demonstration and keeps the 191 00:20:19,692 --> 00:20:24,536 separate forty-five-minute manual example Confirm the selected deletion 192 00:20:24,731 --> 00:20:29,913 reopen Timesheets and verify the remaining row For real work check 193 00:20:29,926 --> 00:20:34,549 the record and billing state before deletion Removing time is separate 194 00:20:34,562 --> 00:20:36,111 from stopping a running timer 195 00:20:45,242 --> 00:20:48,810 Open Options beside the intended checklist step and choose its edit 196 00:20:48,823 --> 00:20:53,616 control Update the wording so the owner can verify a clear outcome 197 00:20:53,864 --> 00:20:58,708 then save and check the stored label This example changes the preparation 198 00:20:58,721 --> 00:21:03,460 step to Review the demonstration scope and task brief Keep completion 199 00:21:03,473 --> 00:21:07,874 separate from editing the wording Review existing copies and saved 200 00:21:07,887 --> 00:21:11,051 templates separately when their wording also needs a change 201 00:21:18,142 --> 00:21:21,983 Use Options beside a step to move it up or down within its checklist 202 00:21:22,884 --> 00:21:27,259 Review the intended sequence before changing it We will move the 203 00:21:27,272 --> 00:21:30,748 scope-review step down to demonstrate the control then restore it 204 00:21:30,761 --> 00:21:34,993 before the attachment check Check the final order and completion 205 00:21:35,006 --> 00:21:39,837 boxes Reordering the steps does not mean the work has been completed 206 00:21:47,275 --> 00:21:51,821 An unnecessary step can be removed from its own Options menu For 207 00:21:51,834 --> 00:21:55,298 this demonstration add a clearly labelled optional training check 208 00:21:55,584 --> 00:22:00,415 review its label then remove only that step Confirm the action if 209 00:22:00,428 --> 00:22:04,269 prompted and reopen the task to verify the original checklist remains 210 00:22:05,168 --> 00:22:08,058 Review the scope before removing a real work item 211 00:22:14,276 --> 00:22:18,286 An empty unused checklist can be removed without changing the delivery 212 00:22:18,299 --> 00:22:22,559 steps in the other stages Add a clearly labelled optional training 213 00:22:22,572 --> 00:22:26,856 checklist review that it contains no items then choose Remove empty 214 00:22:26,869 --> 00:22:32,507 checklist Confirm the action if prompted and reopen the task Check 215 00:22:32,520 --> 00:22:37,065 that the two original stages and their steps remain Review the scope 216 00:22:37,078 --> 00:22:39,460 before removing real workflow records 217 00:22:45,275 --> 00:22:49,704 Review the checklist outcomes before marking steps complete The 218 00:22:49,717 --> 00:22:52,764 demonstration scope has been reviewed and the training file has 219 00:22:52,777 --> 00:22:57,634 been uploaded and checked so mark those two preparation steps Choose 220 00:22:57,647 --> 00:23:01,879 Complete stage when its items are done Check that the next stage 221 00:23:01,892 --> 00:23:06,293 becomes Ready for its owner Completing a checklist stage is separate 222 00:23:06,306 --> 00:23:07,933 from completing the whole task 223 00:23:20,809 --> 00:23:25,225 Review the training brief and the final checklist outcome Mark the 224 00:23:25,238 --> 00:23:30,264 review step only after that check then choose Complete stage Confirm 225 00:23:30,277 --> 00:23:34,887 that both checklists show complete The task itself remains a separate 226 00:23:34,900 --> 00:23:38,480 record with its own completion action so completed checklist stages 227 00:23:38,493 --> 00:23:41,710 do not by themselves mean the task has been marked complete 228 00:23:48,443 --> 00:23:52,089 Use Reopen checklist when a completed stage needs another review 229 00:23:52,989 --> 00:23:56,635 Check the item states again and clear the review step while reassessing 230 00:23:56,648 --> 00:24:00,685 it After the training result has been checked mark the step and 231 00:24:00,698 --> 00:24:05,125 complete the stage again Verify that the earlier stage is preserved 232 00:24:05,138 --> 00:24:10,086 and both stages return to complete Use this workflow to keep changes 233 00:24:10,099 --> 00:24:11,948 and review responsibility clear 234 00:24:19,444 --> 00:24:23,116 Once the required checklist stages and task outcome have been reviewed 235 00:24:23,337 --> 00:24:28,040 use the task’s completion button Verify the task status changes 236 00:24:28,053 --> 00:24:32,454 to Complete This is the separate task-completion action following 237 00:24:32,467 --> 00:24:36,959 the checklist work It does not send an invoice or take a payment 238 00:24:37,858 --> 00:24:41,165 The demonstration uses fictional delivery records throughout 239 00:24:45,069 --> 00:24:50,136 Close the completed task and open the delivery- review task Its prerequisite 240 00:24:50,149 --> 00:24:53,470 selection remains saved but the waiting condition clears because 241 00:24:53,483 --> 00:24:57,714 the required task is now complete Check that the first checklist 242 00:24:57,727 --> 00:25:01,582 stage is Ready while the delivery task itself remains Not Started 243 00:25:02,480 --> 00:25:05,826 This separates prerequisite readiness from someone actually starting 244 00:25:05,839 --> 00:25:07,454 or completing the next task 245 00:25:13,044 --> 00:25:16,677 Choose Invoice Project and review how eligible work will be grouped 246 00:25:17,577 --> 00:25:21,796 The options are Single line Task per item and All timesheets individually 247 00:25:22,695 --> 00:25:27,525 This example keeps Task per item Expand the task list and check 248 00:25:27,538 --> 00:25:31,939 that only the completed training task is selected Review its logged 249 00:25:31,952 --> 00:25:36,236 time before continuing to the invoice form The time and rate are 250 00:25:36,249 --> 00:25:38,632 illustrative no payment has been taken 251 00:25:45,278 --> 00:25:50,044 Review the customer addresses dates currency payment modes and tax 252 00:25:50,057 --> 00:25:54,889 choices This example contains forty-five minutes at seventy-five 253 00:25:54,903 --> 00:25:59,069 pounds per hour totalling fifty-six pounds and twenty-five pence 254 00:25:59,968 --> 00:26:04,369 Keep recurring invoices set to No. Add a clear training note and 255 00:26:04,382 --> 00:26:08,965 disable overdue reminders for this demonstration Review the values 256 00:26:08,978 --> 00:26:11,465 before choosing the appropriate save action 257 00:26:13,915 --> 00:26:18,370 Choose Save as Draft This stores the invoice for review without 258 00:26:18,383 --> 00:26:22,875 sending it to the customer Verify the saved invoice is marked Draft 259 00:26:22,888 --> 00:26:27,550 and check its total on the project’s invoice list Sending recording 260 00:26:27,563 --> 00:26:32,237 a payment and changing invoice status are separate workflows This 261 00:26:32,250 --> 00:26:35,857 demonstration does not send the invoice or request a real payment 262 00:26:41,914 --> 00:26:47,177 Open Sales then choose Invoices Select the saved draft to open its 263 00:26:47,190 --> 00:26:51,486 invoice screen in a new tab The project keeps a link to the same 264 00:26:51,499 --> 00:26:56,421 invoice opening it does not create another record Review the status 265 00:26:56,434 --> 00:26:58,765 and amount before sending anything to a customer 266 00:27:05,113 --> 00:27:09,202 Check the Draft status customer and total of fifty-six pounds and 267 00:27:09,215 --> 00:27:13,891 twenty-five pence Open Activity Log to review how the record was 268 00:27:13,904 --> 00:27:19,230 created then return to Invoice Review the itemised work and fictional 269 00:27:19,243 --> 00:27:24,112 training note This example uses forty-five minutes at seventy-five 270 00:27:24,126 --> 00:27:28,982 pounds per hour Leave the demonstration in Draft sending an invoice 271 00:27:28,995 --> 00:27:31,235 and recording payment are separate actions 272 00:27:35,013 --> 00:27:39,716 Use the task search to find a specific piece of work Enter Review 273 00:27:39,729 --> 00:27:43,908 onboarding workflow and check the matching row Clear the search 274 00:27:43,921 --> 00:27:48,010 to restore the project list Select a column heading to change the 275 00:27:48,023 --> 00:27:52,684 sort order then review the task status dates assignee and priority 276 00:27:52,697 --> 00:27:53,218 together 277 00:27:59,194 --> 00:28:05,785 Choose Export to review Excel CSV PDF and Print Select CSV for this 278 00:28:05,798 --> 00:28:10,316 example Check the exported rows against the tasks displayed in the 279 00:28:10,329 --> 00:28:15,329 project An export is a working copy for authorised review it does 280 00:28:15,342 --> 00:28:17,386 not change a task or its status 281 00:28:29,613 --> 00:28:34,862 Select the two review tasks then choose Bulk Actions Check the selection 282 00:28:34,876 --> 00:28:39,537 before making a change Add the Module review tag and leave the other 283 00:28:39,550 --> 00:28:45,735 fields unchanged Keep Mass Delete unselected Confirm then review 284 00:28:45,748 --> 00:28:50,240 the resulting rows Bulk actions apply the chosen changes to the 285 00:28:50,253 --> 00:28:54,146 selected tasks so verify both the selection and the values each 286 00:28:54,159 --> 00:28:54,615 time 287 00:29:01,112 --> 00:29:05,723 Open Timesheets to review time recorded against this project Check 288 00:29:05,737 --> 00:29:10,736 the member task start and end times note and both duration formats 289 00:29:11,635 --> 00:29:15,671 The training entry is forty-five minutes or zero point seven-five 290 00:29:15,684 --> 00:29:21,427 hours Billed means that this time is linked to an invoice Our invoice 291 00:29:21,440 --> 00:29:25,164 remains a draft that label does not mean payment was received 292 00:29:29,585 --> 00:29:33,075 Search the project timesheets for the relevant task then clear the 293 00:29:33,088 --> 00:29:38,012 search to review the complete list Choose Export and select CSV 294 00:29:38,910 --> 00:29:42,230 Check the exported entry against the screen before using it in an 295 00:29:42,243 --> 00:29:47,204 authorised report Search and export do not start a timer or create 296 00:29:47,217 --> 00:29:48,246 another time entry 297 00:29:54,713 --> 00:29:58,671 Open Milestones to see how tasks are grouped into delivery stages 298 00:29:59,572 --> 00:30:03,140 Clear Exclude Completed Tasks to include the completed checklist 299 00:30:03,153 --> 00:30:07,332 task in the review Use the view switch to compare the board with 300 00:30:07,345 --> 00:30:12,254 the milestone list then return to the board Check each stage’s dates 301 00:30:12,267 --> 00:30:17,059 and logged time The filter changes what you see it does not reopen 302 00:30:17,072 --> 00:30:18,270 a completed task 303 00:30:28,114 --> 00:30:32,439 Open Gantt to review the project schedule visually Change the scale 304 00:30:32,452 --> 00:30:37,582 from months to weeks then days to inspect the delivery window Dates 305 00:30:37,595 --> 00:30:42,166 come from the saved milestones and tasks Choose a scale that makes 306 00:30:42,179 --> 00:30:45,733 the relevant period readable before discussing progress or deadlines 307 00:30:45,746 --> 00:30:46,554 with your team 308 00:30:52,306 --> 00:30:56,251 Use the grouping control to review work by Members or Status then 309 00:30:56,264 --> 00:31:01,123 return to Milestones Select In Progress to focus the chart on active 310 00:31:01,136 --> 00:31:05,967 work and restore All afterwards These controls change the chart 311 00:31:05,980 --> 00:31:10,550 view Check the underlying task record before changing its dates 312 00:31:10,785 --> 00:31:12,113 owner or status 313 00:31:33,414 --> 00:31:38,247 Open Files to keep project documents with the delivery record Review 314 00:31:38,260 --> 00:31:42,726 Visible to Customer before uploading This training document starts 315 00:31:42,739 --> 00:31:47,596 private Select the upload area choose the delivery plan and wait 316 00:31:47,609 --> 00:31:52,127 for its row to appear Confirm the filename and visibility before 317 00:31:52,140 --> 00:31:53,494 sharing it with a customer 318 00:31:57,618 --> 00:32:01,954 Return to Tasks then reopen Files to confirm that the document remains 319 00:32:01,967 --> 00:32:06,149 saved Review its uploaded-by and date information along with the 320 00:32:06,162 --> 00:32:11,071 filename Project files and task attachments are separate locations 321 00:32:11,292 --> 00:32:14,729 use the location that matches the work and check customer access 322 00:32:14,742 --> 00:32:16,279 before making either visible 323 00:32:26,914 --> 00:32:31,825 Select the filename to open its file details Preview availability 324 00:32:31,838 --> 00:32:36,877 depends on the file type This text document shows No preview available 325 00:32:37,098 --> 00:32:41,682 so choose Download Check the downloaded content against the document 326 00:32:41,695 --> 00:32:47,137 you intended to attach Close the details when finished The project 327 00:32:47,150 --> 00:32:50,822 keeps the same saved file downloading it does not create another 328 00:32:50,835 --> 00:32:51,512 attachment 329 00:32:54,847 --> 00:32:59,458 Open Discussions and choose Create Discussion Give the topic a clear 330 00:32:59,472 --> 00:33:03,859 subject and describe the decision or next step Clear Visible to 331 00:33:03,873 --> 00:33:08,807 Customer for this internal training review Save once then confirm 332 00:33:08,820 --> 00:33:11,542 that the subject appears in the project’s discussion list 333 00:33:22,569 --> 00:33:25,994 Reopen the project discussion list and select the saved subject 334 00:33:26,894 --> 00:33:31,738 Review the topic before adding a response Keep discussion visibility 335 00:33:31,751 --> 00:33:35,292 aligned with the intended audience an internal delivery review is 336 00:33:35,305 --> 00:33:38,066 separate from a customer-facing request or approval 337 00:33:57,947 --> 00:34:01,424 Write a concise response in the discussion editor and choose Send 338 00:34:02,324 --> 00:34:06,712 State the outcome and the next action clearly Reopen the discussion 339 00:34:06,725 --> 00:34:11,022 to verify the response and comment count This topic is internal 340 00:34:11,035 --> 00:34:14,512 to the project team customer visibility was disabled when it was 341 00:34:14,525 --> 00:34:19,108 created Use discussion replies to keep the delivery conversation 342 00:34:19,121 --> 00:34:19,993 with the project 343 00:34:35,781 --> 00:34:40,171 Open Notes and choose New Note Enter a clear title and write the 344 00:34:40,184 --> 00:34:45,015 reminder in Note Content then choose Save note Return to Notes to 345 00:34:45,028 --> 00:34:49,520 confirm that it was saved Personal notes support your own project 346 00:34:49,533 --> 00:34:52,997 review use the appropriate discussion or delivery workflow when 347 00:34:53,010 --> 00:34:55,288 a response from someone else is required 348 00:35:32,281 --> 00:35:35,992 Select the note’s edit control update its title and content and 349 00:35:36,005 --> 00:35:41,814 choose Save note Reopen Notes to verify the saved wording Use a 350 00:35:41,827 --> 00:35:45,265 clear subject so that the reminder remains easy to identify when 351 00:35:45,278 --> 00:35:46,645 reviewing the project later 352 00:36:25,158 --> 00:36:29,077 When a personal note is no longer needed identify the correct row 353 00:36:29,090 --> 00:36:34,066 and choose its delete control Confirm the deletion once then reopen 354 00:36:34,079 --> 00:36:38,376 Notes to check the result Here we remove only the clearly named 355 00:36:38,389 --> 00:36:44,144 training note The project tasks files and discussion are preserved 356 00:36:59,816 --> 00:37:04,948 An expense needs a category If this workspace has none open Setup 357 00:37:05,144 --> 00:37:10,300 Finance and Expenses Categories Choose New Category enter a clear 358 00:37:10,313 --> 00:37:15,118 Category Name and describe its use Save then check the category 359 00:37:15,131 --> 00:37:19,727 list This example creates Training costs for fictional walkthrough 360 00:37:19,740 --> 00:37:25,079 entries A category organises expenses it does not record a payment 361 00:37:45,917 --> 00:37:51,062 Open Sales and Expenses then choose Record Expense Enter the Name 362 00:37:51,075 --> 00:37:55,294 and Note select Training costs and review Expense Date Amount and 363 00:37:55,307 --> 00:38:00,620 the customer Use the currency shown for this customer This fictional 364 00:38:00,633 --> 00:38:05,372 example uses twelve pounds and fifty pence Leave Billable off for 365 00:38:05,385 --> 00:38:08,341 an internal training cost and review the tax fields 366 00:38:48,306 --> 00:38:52,891 Check the reference and Payment Mode before Save A genuine receipt 367 00:38:52,904 --> 00:38:57,553 can be attached when needed This example has no actual purchase 368 00:38:57,566 --> 00:39:02,579 or receipt Save the demonstration entry reopen the project’s Expenses 369 00:39:02,592 --> 00:39:07,787 list and verify its category amount date and reference Recording 370 00:39:07,800 --> 00:39:10,470 an example expense does not make a bank payment 371 00:39:45,616 --> 00:39:48,663 Use the file’s Visible to Customer switch to share the reviewed 372 00:39:48,676 --> 00:39:53,092 training plan with the project customer Reopen Files and check that 373 00:39:53,105 --> 00:39:57,558 the switch remains on File visibility and the contact’s project 374 00:39:57,571 --> 00:40:01,907 permissions work together Enabling visibility does not email the 375 00:40:01,920 --> 00:40:04,798 document emailing a file is a separate action 376 00:40:20,049 --> 00:40:24,348 Open the correct task and review Comments Select the comment box 377 00:40:24,361 --> 00:40:28,684 to open its editor Write the next action clearly so that the task’s 378 00:40:28,697 --> 00:40:33,528 delivery context remains easy to follow This example is a private 379 00:40:33,710 --> 00:40:35,351 non-billable training task 380 00:40:39,957 --> 00:40:43,577 Choose Add Comment then close and reopen the task to verify the 381 00:40:43,590 --> 00:40:48,410 saved response Check the message in its task context before moving 382 00:40:48,423 --> 00:40:53,188 on Keep customer-facing requests in the appropriate authorised project 383 00:40:53,201 --> 00:40:55,037 discussion or delivery workflow 384 00:41:01,982 --> 00:41:06,593 Use the plus control beside Reminders on the correct task Choose 385 00:41:06,606 --> 00:41:11,112 Date to be notified confirm Set reminder to and describe the follow-up 386 00:41:12,010 --> 00:41:16,489 This example uses an in-app reminder for James Bennett Leave the 387 00:41:16,502 --> 00:41:19,328 email option off when no email is required 388 00:41:27,719 --> 00:41:32,422 Choose Create Reminder then close and reopen the task Check the 389 00:41:32,435 --> 00:41:37,344 saved description date and responsible member Use the workspace’s 390 00:41:37,357 --> 00:41:41,718 configured time zone when setting a reminder This training reminder 391 00:41:41,732 --> 00:41:43,815 will be removed after the demonstration 392 00:41:46,616 --> 00:41:51,084 Select the reminder’s edit control Update the notification time 393 00:41:51,097 --> 00:41:54,756 and description keep the responsible member unchanged and choose 394 00:41:54,769 --> 00:42:00,798 Save Reopen the task to check the revised reminder Review the email 395 00:42:00,811 --> 00:42:03,714 option separately it remains off in this example 396 00:42:21,054 --> 00:42:24,908 Identify the reviewed training reminder and choose its delete control 397 00:42:25,809 --> 00:42:29,077 Follow the confirmation prompt and reopen the task to verify that 398 00:42:29,090 --> 00:42:33,556 the reminder is gone We remove this example before its scheduled 399 00:42:33,569 --> 00:42:39,142 time The task project and other customer or lead reminders are preserved 400 00:42:43,750 --> 00:42:48,492 Open Actions and Edit then review Repeat every Choose 1 Month for 401 00:42:48,505 --> 00:42:54,208 this example Clear Infinity and set Total Cycles to one Check the 402 00:42:54,221 --> 00:42:59,390 task’s dates project and visibility before saving The repeat setting 403 00:42:59,403 --> 00:43:03,440 schedules future copies it is separate from copying a task immediately 404 00:43:18,751 --> 00:43:22,748 In the task’s Edit form open Repeat every and select the blank first 405 00:43:22,761 --> 00:43:28,493 option The control returns to Nothing selected Choose Save to return 406 00:43:28,506 --> 00:43:33,532 this training task to one-off work Next reopen the saved task and 407 00:43:33,545 --> 00:43:35,915 check that the repeat setting remains cleared 408 00:43:45,684 --> 00:43:49,356 Open the saved training task from the project list choose Actions 409 00:43:49,447 --> 00:43:54,306 and Edit and check Repeat every Nothing selected confirms that this 410 00:43:54,319 --> 00:43:59,293 task has no repeat schedule Review its existing project dates and 411 00:43:59,306 --> 00:44:04,150 visibility settings as well The three original project tasks remain 412 00:44:04,163 --> 00:44:04,762 in the list 413 00:44:09,684 --> 00:44:13,317 Open Submissions to keep deliverables reference notes and client 414 00:44:13,330 --> 00:44:17,928 decisions together New drafts remain private to the project team 415 00:44:18,827 --> 00:44:21,991 Enter a clear submission title and a description of what is ready 416 00:44:22,004 --> 00:44:26,600 for review This fictional delivery pack demonstrates the setup it 417 00:44:26,613 --> 00:44:28,996 does not represent actual client work 418 00:44:33,867 --> 00:44:38,400 Add reference notes and any relevant supporting links Attach only 419 00:44:38,413 --> 00:44:42,359 documents intended for this delivery record then choose Save draft 420 00:44:43,257 --> 00:44:47,893 Reopen the saved draft and verify its title description and attachments 421 00:44:48,791 --> 00:44:52,346 Submit to client is a separate action use it only after checking 422 00:44:52,359 --> 00:44:54,090 the recipients and the contents 423 00:45:02,085 --> 00:45:05,510 Return to Submissions and open Training delivery pack from the records 424 00:45:05,523 --> 00:45:10,707 list Check the saved draft status reference notes supporting link 425 00:45:10,798 --> 00:45:15,603 and encrypted attachment The audit trail records the draft creation 426 00:45:16,501 --> 00:45:19,834 The notification counters remain at zero because this draft has 427 00:45:19,848 --> 00:45:21,553 not been submitted to the client 428 00:45:27,888 --> 00:45:32,968 Use Filters to focus a busy task list Choose New Filter then add 429 00:45:32,981 --> 00:45:37,617 a Status rule and select In Progress Enable Save Filter and give 430 00:45:37,630 --> 00:45:42,031 the view a clear name Review sharing and default settings before 431 00:45:42,044 --> 00:45:46,666 choosing Apply and Save This training filter remains private and 432 00:45:46,679 --> 00:45:48,033 is not the default view 433 00:46:08,119 --> 00:46:13,225 Open Filters again and select Training In- progress tasks The list 434 00:46:13,238 --> 00:46:17,704 shows only the matching training task A filter changes the view 435 00:46:17,978 --> 00:46:22,665 it does not remove other records Use Clear Filter to return to the 436 00:46:22,678 --> 00:46:26,376 full list and verify that all three project tasks are still present 437 00:46:32,252 --> 00:46:35,676 Open the task’s current milestone and choose the required delivery 438 00:46:35,690 --> 00:46:41,577 stage Here move the private training task to Delivery review Check 439 00:46:41,590 --> 00:46:46,317 the saved milestone label and the existing task dates Changing this 440 00:46:46,330 --> 00:46:49,793 grouping does not replace the task’s own start and due dates 441 00:46:54,543 --> 00:46:58,371 Use the same milestone control to return this training task to Client 442 00:46:58,384 --> 00:47:02,553 brief Reopen the task from the project list and check the saved 443 00:47:02,566 --> 00:47:07,488 milestone again Its checklist stages dates and private visibility 444 00:47:07,501 --> 00:47:12,071 remain in place In normal work choose the milestone that matches 445 00:47:12,084 --> 00:47:14,089 the task’s agreed delivery stage 446 00:47:19,654 --> 00:47:24,083 Choose Tasks Overview to review the project’s tasks together The 447 00:47:24,096 --> 00:47:30,125 report shows dates status attachments comments and logged time Filter 448 00:47:30,138 --> 00:47:36,049 by team member month year and task status Select Complete and choose 449 00:47:36,062 --> 00:47:39,487 Filter to inspect the finished task and its saved forty-five-minute 450 00:47:39,500 --> 00:47:40,594 training time entry 451 00:47:50,514 --> 00:47:54,995 Change Status back to All and choose Filter again Verify that the 452 00:47:55,008 --> 00:47:59,396 completed in-progress and not-started training tasks are all present 453 00:48:00,295 --> 00:48:04,474 Use this view to review delivery progress then open a task to inspect 454 00:48:04,487 --> 00:48:08,355 its detailed checklist stages supporting files and comments 455 00:48:14,553 --> 00:48:19,672 Choose the Kanban view button to group project tasks by status Drag 456 00:48:19,685 --> 00:48:23,891 the private training task from In Progress to Testing Reopen the 457 00:48:23,904 --> 00:48:28,526 project list and board to verify that the stage was saved In live 458 00:48:28,539 --> 00:48:32,146 work move a task only when its actual delivery stage and required 459 00:48:32,159 --> 00:48:33,539 checks support the change 460 00:48:49,287 --> 00:48:52,777 Return the training card to In Progress then reopen the project 461 00:48:52,790 --> 00:48:57,622 list to verify the saved status The other tasks remain Not Started 462 00:48:57,635 --> 00:49:03,000 and Complete Kanban updates task status checklist stages project 463 00:49:03,013 --> 00:49:06,581 milestones and the overall project status are reviewed through their 464 00:49:06,594 --> 00:49:07,661 own controls 465 00:49:34,321 --> 00:49:39,219 Project status is separate from individual task status Open More 466 00:49:39,232 --> 00:49:43,763 and choose Mark as In Progress Review the additional actions before 467 00:49:43,776 --> 00:49:48,412 confirming Leave member notifications and completion of all tasks 468 00:49:48,425 --> 00:49:53,047 off for this example Confirm then reopen Overview to verify the 469 00:49:53,060 --> 00:49:54,544 saved project status 470 00:50:13,021 --> 00:50:16,680 Open More and choose Pin Project to keep a frequently used project 471 00:50:16,693 --> 00:50:22,750 easy to reach Reopen More after the page refreshes The action changes 472 00:50:22,763 --> 00:50:26,096 to Unpin Project confirming that the project is pinned for this 473 00:50:26,109 --> 00:50:30,497 staff account Pinning does not change the project’s delivery status 474 00:50:30,510 --> 00:50:31,968 or its customer permissions 475 00:50:53,931 --> 00:50:57,277 Choose Unpin Project to remove this training project from the pinned 476 00:50:57,290 --> 00:51:02,149 shortcuts Reopen More and check that Pin Project is available again 477 00:51:03,048 --> 00:51:06,967 The project remains In Progress and its saved tasks time entries 478 00:51:07,123 --> 00:51:09,337 files and permissions are preserved 479 00:51:24,455 --> 00:51:27,736 Open Activity to review dated changes and the colleague who made 480 00:51:27,749 --> 00:51:32,165 them Review each Visible to customer switch as well as the project’s 481 00:51:32,178 --> 00:51:36,723 permissions The label is present beside both enabled and disabled 482 00:51:36,736 --> 00:51:40,056 switches check the actual switch state before deciding what the 483 00:51:40,069 --> 00:51:41,150 customer can see 484 00:51:48,159 --> 00:51:53,643 The project also links to Tickets Contracts and Sales records Open 485 00:51:53,656 --> 00:51:58,278 the relevant section to review its records in context In this training 486 00:51:58,291 --> 00:52:03,122 project Tickets and Contracts are empty Sales contains the saved 487 00:52:03,135 --> 00:52:07,328 invoice draft its draft status does not represent a sent invoice 488 00:52:07,497 --> 00:52:09,177 a payment or actual work 489 00:52:39,636 --> 00:52:43,738 Return to Overview open More and choose View project as customer 490 00:52:44,638 --> 00:52:49,378 The authorised preview opens in another tab Review it as the intended 491 00:52:49,391 --> 00:52:54,260 customer checking which tasks milestones files and discussions are 492 00:52:54,274 --> 00:52:58,609 available Staff-only work and private drafts should be assessed 493 00:52:58,622 --> 00:53:01,773 from this customer perspective before sharing a live project 494 00:53:12,090 --> 00:53:15,684 Activity visibility is configured separately from a milestone or 495 00:53:15,697 --> 00:53:20,647 invoice record Before sharing the project review each event’s Visible 496 00:53:20,660 --> 00:53:24,826 to customer switch Turn it off for the private training milestone 497 00:53:24,840 --> 00:53:29,371 and the unsent invoice draft The events remain in the staff activity 498 00:53:29,384 --> 00:53:32,652 history while their customer visibility is removed 499 00:53:37,241 --> 00:53:41,826 Return to Overview and reopen Activity Check that both selected 500 00:53:41,839 --> 00:53:45,043 switches remain off and that the staff events are still present 501 00:53:45,941 --> 00:53:50,576 Then review the signed-in customer account again Keep suitable progress 502 00:53:50,589 --> 00:53:54,392 updates visible and assess the activity trail alongside the project’s 503 00:53:54,405 --> 00:53:55,798 other customer permissions 504 00:54:06,690 --> 00:54:10,232 After the contact signs in privately review the actual customer 505 00:54:10,245 --> 00:54:15,169 portal Project sections follow contact permissions and project settings 506 00:54:16,067 --> 00:54:20,559 Open Tasks and Milestones to check the customer- visible work In 507 00:54:20,572 --> 00:54:24,869 this example the completed task and Client brief milestone are available 508 00:54:25,104 --> 00:54:28,150 the internal review tasks and milestone remain hidden 509 00:54:34,675 --> 00:54:38,217 Open Files to confirm that the approved project delivery plan is 510 00:54:38,230 --> 00:54:44,091 available Then review Discussions and Submissions The internal discussion 511 00:54:44,104 --> 00:54:47,880 is not shared and the private delivery draft is absent from customer 512 00:54:47,893 --> 00:54:52,372 review until it is submitted Check these sections using the intended 513 00:54:52,385 --> 00:54:53,727 contact’s own account 514 00:55:15,886 --> 00:55:19,115 Return to the project and open Activity to review the customer’s 515 00:55:19,128 --> 00:55:23,675 update trail Financial and timesheet sections are absent because 516 00:55:23,688 --> 00:55:28,102 those permissions are off Review the actual customer account after 517 00:55:28,115 --> 00:55:31,669 changing permissions and distinguish overall project progress from 518 00:55:31,682 --> 00:55:34,078 the tasks that the customer is allowed to see 519 00:55:59,088 --> 00:56:04,650 Open More and choose Copy Project Review the tasks checklist items 520 00:56:04,884 --> 00:56:09,520 assignees followers milestones and members options before copying 521 00:56:10,418 --> 00:56:14,142 For this demonstration turn those options off so the temporary copy 522 00:56:14,155 --> 00:56:19,194 contains no delivery records Enter a distinct project name and choose 523 00:56:19,207 --> 00:56:21,004 the intended customer and dates 524 00:56:58,650 --> 00:57:03,064 Check the name customer dates and unchecked copy options then choose 525 00:57:03,077 --> 00:57:08,053 Copy Project once Open the copied project’s Tasks and Files sections 526 00:57:08,066 --> 00:57:12,467 to confirm that no delivery work or documents were copied Keep the 527 00:57:12,480 --> 00:57:16,842 source project intact This clearly named temporary copy will be 528 00:57:16,855 --> 00:57:18,366 removed in the next chapter 529 00:57:31,889 --> 00:57:36,500 Check the project name before using Delete Project This example 530 00:57:36,514 --> 00:57:41,201 removes only Temporary project copy whose tasks files and financial 531 00:57:41,214 --> 00:57:46,175 lists were verified empty Open More choose Delete Project and read 532 00:57:46,188 --> 00:57:50,732 the confirmation After deletion check that the original Willowbrook 533 00:57:50,745 --> 00:57:52,750 onboarding project remains available 534 00:57:54,556 --> 00:57:59,154 The temporary copy has been removed Reopen Willowbrook onboarding 535 00:57:59,167 --> 00:58:03,777 from the project list and check its In Progress status Review Tasks 536 00:58:03,790 --> 00:58:07,149 and Files to verify that the three original tasks and the delivery 537 00:58:07,162 --> 00:58:11,759 plan remain saved Removing the empty copy has preserved the source 538 00:58:11,772 --> 00:58:13,712 project and its delivery records 539 00:58:29,695 --> 00:58:34,372 Review the project name and saved task list before exporting Check 540 00:58:34,385 --> 00:58:38,213 that you are working with the intended customer and project The 541 00:58:38,226 --> 00:58:43,499 original training project still contains three tasks Return to Overview 542 00:58:43,760 --> 00:58:48,460 then use More to find Export project data This action produces a 543 00:58:48,473 --> 00:58:50,140 PDF project report 544 00:58:58,635 --> 00:59:03,481 Open More and choose Export project data The application generates 545 00:59:03,494 --> 00:59:08,233 the project report as a PDF in another tab Check its filename and 546 00:59:08,246 --> 00:59:12,595 contents before downloading or forwarding it The report reflects 547 00:59:12,608 --> 00:59:16,645 the saved project records at the time of export this example contains 548 00:59:16,658 --> 00:59:18,051 fictional training data 549 00:59:23,490 --> 00:59:26,667 You have followed the project from customer details and permissions 550 00:59:26,680 --> 00:59:32,201 through milestones tasks checklist handovers files discussions time 551 00:59:32,214 --> 00:59:36,591 tracking and draft billing You have also reviewed customer access 552 00:59:36,773 --> 00:59:40,849 saved delivery drafts activity visibility project copying and the 553 00:59:40,862 --> 00:59:46,240 PDF export Use the feature chapters to return to a specific workflow 554 00:59:47,138 --> 00:59:50,875 In your own workspace check the saved result after each change and 555 00:59:50,888 --> 00:59:54,612 confirm the intended customer access before sharing delivery work