Category

Advanced Task Filters

Create code-backed task reports using staff, status, billable, relationship, customer-group, tag, date and grouping criteria, then save personal templates for repeat use.

5 connected guidesLive filterPermission-aware instructions

Detailed module walkthrough

Watch the complete walkthrough

Follow live clicks through task criteria, linked records, date periods, grouping, report columns, supporting task details, personal templates, access controls and troubleshooting. Use 42 feature chapters, clear instructions, English narration, captions and a complete transcript.

22:2542 feature chaptersEnglish captionsLive application clicks
Watch this walkthrough on YouTube

Use the YouTube player for this complete walkthrough. Loading the player connects to YouTube; the video remains paused until you press Play. The chapter links, transcript and downloadable version above remain available.

Browse 42 feature chapters
  1. Review task work through focused reports
  2. Check In Progress and All Time before interpreting the result
  3. Review work assigned to one staff member
  4. Include the task statuses that answer your question
  5. Compare billable and non-billable work
  6. Combine tags with staff and billing criteria
  7. Choose a reporting period and its date basis
  8. Compare a broader period and sort its dates
  9. Review completed work using its completion date
  10. Check exact From and To dates
  11. Start with individual task rows
  12. Organise matching work by its related record
  13. Compare the order of record and task-name grouping
  14. Review work by task name or status
  15. Choose the CRM context for the report
  16. Search for a specific existing project
  17. Review customer tasks within a selected group
  18. Narrow the same review to a named customer
  19. Choose the columns needed for the review
  20. Review and change the current table presentation
  21. Find a matching task and review export formats
  22. Open the task to verify its current context
  23. Read the two checklist measures separately
  24. Compare logged time and completion dates
  25. Review supporting details without changing the task
  26. Follow the related record and return to the report
  27. Prepare a reusable personal task report
  28. Save a clearly named report definition
  29. Reload and verify the saved criteria
  30. Update the same personal definition
  31. Reload and check the updated definition
  32. Review management controls for the saved definition
  33. Review module access through the intended role
  34. Review core Tasks scope alongside module access
  35. Use configured task fields in the report
  36. Verify deployment through the authorised process
  37. Use personal templates within the supported boundaries
  38. Check the status, period and combined criteria
  39. Check the context of missing controls
  40. Name saved definitions and verify them after reloading
  41. Review template actions in activity history
  42. Build a repeatable task-review routine
Read the full transcript

Britixo Advanced Task Filters: Complete Walkthrough | Reports & Templates

00:00 Review task work through focused reports Britixo Advanced Task Filters helps you review task work by staff member, status, billing state, related records, tags and dates. Compare operational details, organise the result with grouping, and save useful personal report definitions. This walkthrough follows the live application with fictional training records and clear, repeatable steps.

00:24 Check In Progress and All Time before interpreting the result The fresh report starts with In Progress and All Time. Check the selected status before assuming that completed or not-started tasks are included. Open the status list to review its choices, then close it without changing the report. This reporting workspace complements the core Tasks list and its record controls.

00:50 Review work assigned to one staff member Choose James Bennett in Staff Members and apply Filter. This narrows the report to the selected assignee while keeping In Progress and All Time. The control is available to globally authorised task viewers. Selecting a report criterion does not reassign the tasks or change the staff member’s permissions.

01:15 Include the task statuses that answer your question Choose New and select both In Progress and Not Started under Status, then apply Filter. Selected statuses are alternatives within this criterion. Check the labels on the matching rows. Choose the status set deliberately when reviewing historical or completed work, rather than relying on the initial In Progress default.

01:40 Compare billable and non-billable work Start a fresh report and select Yes under Billable. Apply the report and check the returned Billable column. Change the criterion to No and compare the matching tasks. This filters the task’s existing billing flag; it does not create an invoice, record a payment or change whether the task is billable.

02:13 Combine tags with staff and billing criteria Choose New and combine James Bennett, non-billable work and the Module review or training-review tags. Apply Filter and inspect the matching rows. Tags inside this selector are alternatives, while staff, status and billing criteria narrow the same report together. Choose New when you want to return to the initial view.

03:10 Choose a reporting period and its date basis Open Period to review All Time, daily, weekly, monthly, yearly and rolling ranges. Choose Today to reveal Filter By Date, with Start Date selected, then apply Filter. Check the rows or the no-results message. A bounded date period can exclude otherwise permitted tasks without changing those records.

03:34 Compare a broader period and sort its dates Choose This Year and run the report with the same status criteria. Select the Start Date column to review dates in ascending order. Check the visible sort indicator and returned dates together. Table sorting changes the presentation of the current matching set; it does not move a task’s scheduled start date.

04:00 Review completed work using its completion date Select Complete as the only Status and choose Completed Date under Filter By Date. Apply the report and review its matching completed work. This date basis measures stored completion rather than planned start. Tasks without a matching completion date will not enter a bounded completion-date report.

04:34 Check exact From and To dates Start a fresh report and choose Period for an exact date range. Use Start Date and enter From and To in the displayed format. This example uses the fifth to the thirteenth of November, twenty twenty-six. Apply the report and check both boundaries. Verify exact date-time boundaries before relying on a same-day result.

05:22 Start with individual task rows Leave Group by Task unselected when you want to review individual tasks together. Check each task name, its status and its related-record context. This is a useful starting point before changing the report’s organisation. Grouping changes how matching work is presented; it does not edit or complete a task.

05:47 Organise matching work by its related record Select Related To under Group by Task and apply Filter. Review the resulting section headings and the tasks inside each section. This lets you examine work in its linked project, customer or other CRM context. Read the individual rows within each section rather than assuming a group heading represents a changed task record.

06:14 Compare the order of record and task-name grouping Choose Related to and Task Name, apply Filter and review the section labels. Then compare Task Name and Related to. The two choices organise the same permitted result with a different leading context. Keep the other criteria unchanged when comparing the layouts, and use the task links when you need the underlying record.

06:49 Review work by task name or status Compare Task Name grouping with Status grouping, applying the report each time. Inspect the headings and matching task rows for the selected view. Grouping supports a different review question without changing the stored work. Choose New when you want to clear the grouping and return to the initial report.

07:33 Choose the CRM context for the report Open Related To to review Project, Invoice, Customer, Estimate, Contract, Ticket, Expense, Lead and Proposal. Select Project and apply Filter to review matching project tasks. The relationship choice determines which type of existing CRM record can be selected next. It does not create a new relationship on the task.

07:58 Search for a specific existing project Open the related-record search and type Willowbrook. Choose the fictional estimate-delivery project and apply Filter. Check that the selected project and returned task context agree. A relationship type and record identifier belong together, so use the normal selector rather than moving an identifier between unrelated record types.

08:22 Review customer tasks within a selected group Start a fresh report, include the intended task statuses and choose Customer under Related To. The Groups control now becomes available. Select Training, Advisory Clients and apply Filter. Review any matching tasks or the clear empty-report message. This criterion follows customer-group membership and applies to customer-related tasks.

09:30 Narrow the same review to a named customer Search the related customer selector for Willowbrook and choose Willowbrook Advisory Limited. Apply Filter and verify the selected customer together with the group and status criteria. A result can be empty when those conditions have no matching task. Choose New to return to the initial In Progress, All Time report.

09:59 Choose the columns needed for the review Use Hide Export Columns to select Total comments and Total attachments added, then apply Filter. Verify that those columns are absent from this report view. This is a presentation choice, separate from access to the underlying task. Review the configured columns and report scope before using any export control.

10:26 Review and change the current table presentation Open Column visibility to review the available fields. Show Total comments again and compare the current table with the selected report criteria. This control changes the current presentation without editing task records. Choose New to return to a fresh report before reviewing a different question.

10:49 Find a matching task and review export formats Start a fresh report and use the table search to find the onboarding-workflow task. Clear the search and select Name to sort the current results. Open Export to review Excel, CSV, PDF and Print. This demonstration previews the formats without creating a separate data copy; check the scope and resulting file before any authorised sharing.

11:24 Open the task to verify its current context Choose the training task’s name from the report to open its core record. Confirm the name, status and linked project before reviewing details. The report surfaces existing operational information; it does not replace the task record. This example is fictional and its displayed billing information does not represent a real service or payment.

11:51 Read the two checklist measures separately The report’s Checklist Items column measures the core checklist items. The separate Checklists and handover panel has its own workflow progress. Here, the workflow stages are complete while the core checklist-items section is empty. Read those measures separately and compare the report with the corresponding section of the task record.

12:16 Compare logged time and completion dates Review the task’s stored logged time and dates, then return to the report. This training task shows forty-five minutes of logged time and a completion date before its due date. Check the report’s Finished on time value alongside those dates. Missing or changed due and completion values can limit that conclusion.

12:43 Review supporting details without changing the task Open the task again to review available attachments and comments, and compare its assigned staff and tags with the report. Counts describe the stored records and access still depends on the task and file permissions. This walkthrough reviews the controls without downloading an archive, adding a comment or changing staff assignments.

13:09 Follow the related record and return to the report Choose the linked onboarding project from the matching task row and verify its project page. Return through Task Filters when you need the report again. This keeps the task and its CRM context connected. Navigating to a related record does not change the relationship or apply a new report criterion.

13:39 Prepare a reusable personal task report Open Task Filter Templates and choose Add Task Filter. Keep In Progress and All Time, select billable tasks, then search for the estimate-delivery project. Review the selected project and matching task before saving a useful personal report definition. The criteria describe a view of existing tasks and do not change their status or billing.

14:19 Save a clearly named report definition Select Save as Filter Template and enter Project delivery review, Training. Check the selected status, billable choice, project and period, then choose Filter once. Saving creates a personal report definition, separate from the task records. Use a recognisable name so that you can find and verify the same definition later.

14:44 Reload and verify the saved criteria Return to Task Filter Templates and open the exact saved name. Check that In Progress, billable Yes, the estimate-delivery project and All Time are restored. A saved definition should be verified after reloading. It belongs to the signed-in staff member and does not create a shared team-report service or duplicate any tasks.

15:11 Update the same personal definition With the saved project-delivery report open, add Total comments to Hide Export Columns. Keep Save as Filter Template selected and retain its existing name. Review the criteria, then choose Filter once. This updates the selected personal definition. It changes neither the task comments nor the underlying tasks.

15:35 Reload and check the updated definition Return to Task Filter Templates and search for Project delivery review. Open its name and verify that the identifier is unchanged and Total comments remains hidden. Check the saved status, billable choice, project and period as well. The table search locates definitions in this list; it is separate from the report criteria stored in each definition.

16:04 Review management controls for the saved definition Return to the template list and review the Edit and Delete actions on this exact row. Edit reopens the stored criteria. Delete concerns the saved definition rather than its matching tasks and requires checking the intended entry and confirmation. This demonstration retains the training definition and previews the Delete control without activating removal.

16:37 Review module access through the intended role An authorised administrator can open Roles and review the intended staff role. Find the task-filter View and Create capabilities. In this module version, View also permits saving personal templates, so Create is not a separate reliable gate for that action. Review the documented behaviour before choosing access for real staff. This demonstration changes no permissions.

17:05 Review core Tasks scope alongside module access Review core Tasks View Global alongside the module controls. Global task view affects report scope and the Staff Members selector. Without global view, assigned tasks and, where core creation is allowed, self-created tasks are the relevant cases to verify. Test the intended staff account rather than widening access just to reveal a report control.

17:32 Use configured task fields in the report Return to the report and review its available columns. Extra task custom-field columns depend on the fields configured for table display in this workspace. A field that has not been configured will not appear just because this report is open. Ask an authorised administrator to review the task field configuration, then verify the resulting report and any export.

18:02 Verify deployment through the authorised process Advanced Task Filters is already enabled in this training workspace. Installation and updates belong to the authorised module deployment process. Afterwards, verify the active version, report, role behaviour and personal-template storage. The supplied empty upgrade migrations do not themselves repair missing template storage. This walkthrough does not perform an installation or upgrade.

18:28 Use personal templates within the supported boundaries Saved task filters are personal definitions whose current criteria are stored by the application. Use the normal owner-scoped screens. Administrators should review the documented template-update identifier limitation before wider use. This recording does not certify independent staff isolation or fix that limitation. The module provides interactive reports, rather than its own scheduled reports, API or webhook service.

19:07 Check the status, period and combined criteria If no tasks match, choose New and review the initial In Progress, All Time scope. Add the intended statuses and each further criterion separately. For date questions, choose a bounded period before checking Start Date or Completed Date and both custom boundaries. Compare a known task with its core record. An empty report is not proof that the task is missing.

20:09 Check the context of missing controls The customer Groups control appears when Related To is Customer; it is not a project-group filter. The Staff Members control depends on the intended core task scope. Review those conditions before asking an administrator to change access. Use Column visibility for the current table and Hide Export Columns for the report’s configured presentation, rather than treating either as record protection.

20:39 Name saved definitions and verify them after reloading Select Save as Filter Template to enable its name field. Supply a clear name only when saving a reusable definition. Turn the option off for a temporary report. If a saved report does not load as expected, open its exact name from Task Filter Templates and verify the restored criteria for the signed-in owner before saving a change.

21:09 Review template actions in activity history An authorised administrator can open Activity Log and search for Custom Task Filter. Review the action description, date and staff member together. The added and updated entries help confirm the training workflow, but this activity log is not a versioned copy of each previous definition. Open the saved template itself to inspect its current criteria.

21:40 Build a repeatable task-review routine Start with the intended staff, status and date scope, then combine the relevant relationship and other criteria. Choose a useful grouping, inspect the underlying task and compare its dates, logged time and supporting details. Save useful personal definitions and verify them after reloading. Use this page’s Help link for the complete Advanced Task Filters guides and return to the relevant chapter whenever needed.

Recorded in the live Britixo application using a disposable workspace and fictional training records. Available actions depend on your role, enabled modules and authorised integrations.

5 guides
Workflow

Setup, access and permission scope

Install the module, locate both menu entries and understand the exact relationship between module access and core task permissions.

Open guide →
Workflow

Task report criteria

Apply every implemented staff, status, billable, relationship, customer-group, tag and date filter.

Open guide →
Workflow

Grouping, columns and result interpretation

Group task data, control visible/exported columns and interpret attachments, comments, checklists, time, completion and assignee details.

Open guide →
Workflow

Saved task-filter templates

Create, load, update and delete reusable personal task-filter templates.

Open guide →
Workflow

Security, limitations and troubleshooting

Apply least privilege, understand verified implementation limits and resolve common empty or unexpected reports.

Open guide →