Proposals and estimates · Workflow guide

Set Proposal Validity Dates & Review Expiry

Give a proposal a clear validity period and keep any extension connected to the approved version and customer communication.

Audience: Authorised staffPermission-awareReviewed 16 November 2026

Where to start

Open the intended proposal and review its editable dates, terms and Status / Activity.

Before you start

You need permission to edit the proposal. Confirm the commercial validity period and whether a revision requires approval before changing dates or issuing a new version.

Follow these steps

  1. Open the correct proposal and verify its customer or lead, reference, currency, scope and existing acceptance state.
  2. Review the open and expiry dates shown by the editor. Use the workspace’s displayed date format and an unambiguous approved deadline.
  3. Check that the proposal wording agrees with the configured dates. A date field and a conflicting sentence in the terms can create uncertainty.
  4. Save the authorised change, reload the proposal and inspect the client-facing preview or document to verify the result.
  5. Review reminder or notification behaviour separately. Do not assume that changing a date schedules an email or automatically tells the recipient.
  6. When extending or replacing an expired proposal, follow the approved revision procedure and preserve prior acceptance evidence. Verify the new version and communication before treating it as current.

Expiry and acceptance need separate review

An expired validity period and a previously recorded acceptance are different facts. Review the timeline and applicable agreement rather than simply changing a date to force a desired status.

Where the system offers a revision or resend workflow, check its effect on the recipient link and existing evidence. Important commercial changes should be communicated explicitly.

Check the result

  • The saved dates persist and match the approved terms.
  • The client-facing version has been checked.
  • Any extension, notification or revision is verified separately from the date edit.
Access and data safety

Use the permissions assigned to your own account. Review the correct customer, record and visibility before saving. Do not bypass approval controls or change historical evidence merely to make a status look complete.