Category

Projects, tasks and time tracking

Plan projects, assign work, track time, manage milestones, discussions, files and billable activity.

14 connected guidesLive filterPermission-aware instructions

Detailed module walkthrough

Watch the complete walkthrough

Plan and deliver customer work in one place. Follow project settings, milestones, tasks, checklist handovers, time tracking, draft billing, files, discussions, customer permissions and the native PDF export.

1:00:0979 feature chaptersEnglish captionsLive application clicks
Browse 79 feature chapters
  1. Module overview
  2. Create the project
  3. Customer permissions
  4. Edit project settings
  5. Progress and time totals
  6. Create a milestone
  7. Edit a saved milestone
  8. Private milestones
  9. Create a project task
  10. Verify saved task settings
  11. Owned checklists
  12. Add checklist steps
  13. Checklist handover stage
  14. Sign-off check
  15. Ordered checklist workflow
  16. Attach a task document
  17. Download the task file
  18. Checklist owners and order
  19. Save a workflow template
  20. Copy a task
  21. Prepare a fresh workflow task
  22. Apply the saved workflow
  23. Task prerequisites
  24. Start and stop a timer
  25. Review the timer note
  26. Add manual time
  27. Save and reopen manual time
  28. Edit the manual timesheet
  29. Remove the training timer
  30. Edit a checklist item
  31. Reorder checklist items
  32. Remove an unused item
  33. Remove an empty checklist
  34. Complete and hand over a stage
  35. Complete the final stage
  36. Reopen a checklist stage
  37. Complete a task and unlock work
  38. Select billable task time
  39. Save the invoice draft
  40. Open the project invoice draft
  41. Review draft invoice history
  42. Search, sort and export tasks
  43. Bulk-tag selected tasks
  44. Review and export timesheets
  45. Milestone views
  46. Gantt scales and filters
  47. Upload a project file
  48. Download the project document
  49. Create an internal discussion
  50. Reply to the discussion
  51. Create a personal note
  52. Edit and remove the note
  53. Expense categories
  54. Record the project expense
  55. Customer file visibility
  56. Private task comment
  57. Create a task reminder
  58. Edit and remove the reminder
  59. Save a task repeat schedule
  60. Remove the repeat schedule
  61. Verify the one-off task
  62. Private delivery draft
  63. Reopen the delivery draft
  64. Save a task filter
  65. Reuse and clear the filter
  66. Change a task milestone
  67. Detailed task overview
  68. Move a task on Kanban
  69. Verify the restored task status
  70. Update project status
  71. Pin and unpin the project
  72. Activity and linked records
  73. Customer activity privacy
  74. Signed-in customer access
  75. Copy the project
  76. Delete the empty training copy
  77. Verify the original project
  78. Export the project PDF
  79. Summary and next steps
Read the full transcript

Britixo Projects, Tasks and Time Tracking — Complete Module Walkthrough

00:00 Module overview Open Projects to organise customer delivery, responsibilities and time in one place. This walkthrough uses a fictional onboarding project. We will create its milestones and tasks, review files and discussions, track time, and prepare draft billing. Each chapter shows the actual controls and the saved result. Begin with New Project.

00:35 Create the project Enter a clear project name and select the customer. Keep Calculate progress through tasks selected when completion should follow task status. Review the billing choices: Fixed Rate, Project Hours and Task Hours. This example uses Task Hours, so eligible task time can be reviewed for draft invoicing later. Select the starting status and estimated hours.

Review Members and retain the authorised colleague who will deliver the work. Set the start date and deadline, add a useful tag, then describe the scope. James Bennett is the only staff member in this training workspace. Keep the project-created email off while preparing demonstration records. Project visibility and contact notifications are reviewed separately in Project Settings.

01:47 Customer permissions Open Project Settings before saving. Send contacts notifications controls project updates; choose Do not send notifications for this training example. Visible Tabs controls the available project sections. The checkboxes below govern what customer contacts can view and do. Match these permissions to the agreed client access, including tasks, files, discussions, timesheets and financial information.

02:28 Edit project settings Use More and Edit Project to reopen the saved settings. Check the customer, billing method, dates and members. The date fields in this workspace use year, month and day. Update the estimated hours, then review Project Settings. Contact notifications remain off, and customer access to finance and timesheets is disabled in this example. Save and check the updated overview.

03:18 Progress and time totals The overview brings the project dates, billing method, estimated hours and progress together. Progress is calculated through tasks in this project. Review open tasks, remaining days, logged time and expenses, then use the chart menu to change the reporting period. Billable, billed and unbilled figures describe different states. These training totals do not represent money received.

03:48 Create a milestone In Milestones, choose New Milestone. Give the delivery stage a clear name, then set its start and due dates. Add a useful description and review its customer visibility. Show description to customer controls the description; Hide from customer controls the milestone itself. Set an order, save, and check the milestone on the project.

04:36 Edit a saved milestone Reload the project and check the saved milestone name and date range. Select the milestone heading to edit it. Review the dates, description, customer visibility and order. Update the description, choose Save and reopen the project to confirm the change. This checks the stored result rather than relying only on the save message.

05:05 Private milestones Add a second milestone for the delivery review and give it the next order. This stage starts after the client brief and ends at the project deadline. Select Hide from customer for an internal-only stage. Save and reload the project to confirm both stages. Milestone visibility is separate from staff membership and the customer’s general portal permissions.

05:57 Create a project task Open the project’s Tasks tab and choose New Task. Enter a specific subject, review Billable and Visible to customer, and keep Public off when the task should follow normal staff visibility. Set the illustrative hourly rate, milestone, start date, due date and priority. This example uses a training rate of seventy-five pounds; saving a task does not charge the customer.

Review Related To and confirm the project. Assignees identifies who will deliver the task; Followers identifies who follows its updates. James Bennett is the available colleague in this demonstration workspace. Add a useful tag and a clear description, then choose Save. Reopen the task from the project list to check that its details and responsibility were stored.

07:49 Verify saved task settings Close the task profile and reopen it from the project’s task list. Check the subject, project, milestone, dates, priority and hourly rate. Review the description and the assignee and follower selections. The task is billable but has not been billed. These controls keep the task’s saved details separate from later time tracking and invoice preparation.

08:17 Owned checklists Use Checklists and handover to group the task’s delivery steps. Under Add a checklist, enter a clear checklist name and choose its owner. Select an authorised colleague, or Task assignees when ownership should follow the task assignment. Add the checklist and check that it appears in the workflow. This example assigns Brief preparation to James Bennett.

08:46 Add checklist steps Enter a specific step under the named checklist and choose Add item. Add the remaining steps one at a time, checking each saved label. Leave the completion boxes clear until the work is actually done. Here, the training brief still needs to be attached, so that step remains incomplete. The checklist owner and progress appear with the group.

09:15 Checklist handover stage Add a second named checklist for Delivery sign-off. Choose Task assignees when ownership should follow the assigned delivery colleague. Keep preparation and sign-off as separate groups so their owners and progress remain clear. After adding the stage, review its steps before enabling an ordered handover. Saving a group does not mean its work is complete.

09:43 Sign-off check Open Delivery sign-off and add the review step that must be completed after preparation. Use a clear action so the owner can verify the result. The example asks for a review of the attached demonstration brief. The step remains incomplete until the file and its content have been checked.

10:09 Ordered checklist workflow Open Workflow settings. Complete these checklists in order makes the next stage ready after the preceding stage is completed. Finish every checklist before completing the task keeps checklist completion separate from the final task status. Select the rules needed for this workflow and choose Save settings. Close and reopen the task to verify both saved selections.

10:39 Attach a task document Use the task’s upload area to attach the supporting document. Choose the intended file and wait for the upload to finish. This is a fictional training brief, not a customer agreement or receipt. Close and reopen the task to check that the filename was stored. Review task and customer visibility before uploading real documents. We will verify the downloaded content before completing the attachment checklist step.

11:12 Download the task file Select the saved filename to download the task attachment. Check the filename and open the downloaded document in your normal review process before relying on it. This training download is checked against the original demonstration brief. Only after that verification should the attachment checklist step be completed. Review the recipient and access scope before sharing real documents.

11:41 Checklist owners and order Use Edit on the checklist to clarify its name or review its owner. This example changes the name to Brief preparation and checks while retaining James Bennett as the owner. Save the change and confirm the updated heading. Editing the checklist does not complete its steps or change the task’s billed state.

Use Move up or Move down to change the stage order. With ordered completion enabled, this order determines which stage is ready first. We will move Delivery sign-off up to demonstrate the control, then restore it after preparation. Check the final headings and Ready or Waiting indicators before continuing the work.

12:34 Save a workflow template Open Reuse a checklist workflow. Enter a clear template name and choose Save as template. The template keeps the checklist structure, owners and order for another task. Completed work is reset when the template is used, so a new task does not inherit completed checks. Close and reopen the task to verify the saved template before applying it elsewhere.

13:04 Copy a task Open the task’s three-dot Actions menu and choose Copy. Review which assignees, followers, checklist items and attachments should be copied, then select the new task’s starting status. Available options depend on the source task. Here we retain the assignee and follower, leave attachment copying off and select Not Started. Choose Confirm once and check the new task identifier.

The copy inherits the original subject, so use Actions and Edit to give it a distinct name. This example becomes Review demonstration delivery. Move it to the internal delivery-review milestone and set its own dates and priority. Turn off Billable and Visible to customer for this internal training task. Save and check the updated record while preserving the original task.

14:36 Prepare a fresh workflow task Copying the previous task also retained its grouped checklist structure. Use template is available on a task without grouped checklists, so create a fresh task for this example. Give it a distinct subject, review its project, milestone, dates and assignee, and keep it nonbillable and hidden from the customer. Save the task before applying the stored checklist workflow.

16:00 Apply the saved workflow On the fresh task, open Reuse a checklist workflow. Select the saved onboarding template and choose Use template. Review the copied checklist names, owners, order and unfinished steps. The template provides a starting structure; it does not mean the work has been completed. Close and reopen the task to check that the workflow and its settings were stored.

16:29 Task prerequisites Open Task order and select the task that must finish before this one can start. Here, the delivery review depends on Prepare onboarding checklist. Leave the other task unselected and choose Save task order. Close and reopen the task to verify the selection. Task order controls prerequisites between tasks; ordered checklists control the stages inside a task.

16:58 Start and stop a timer Open the task you are working on and choose Start Timer. The timer belongs to this task and the signed-in staff member. Let it run while reviewing the task details. This is a short training demonstration, not a record of chargeable work. Check the task and any prerequisite rules before starting a timer on real delivery.

Choose the running timer’s stop control, add a useful note and save it. Confirm the task returns to Start Timer, then open Timesheets to review the recorded start, end and duration. Stopping a timer stores time; it does not send an invoice or take a payment. Review billing eligibility separately before using the entry for an invoice.

17:55 Review the timer note Use the edit icon on the recorded timesheet row to inspect its start, end, member and note. The note entered when stopping the timer is retained here. Review the details, then choose Cancel when no change is required. This keeps the original timer entry intact while confirming the information that was stored.

18:30 Add manual time Under Add timesheet, choose Enter time duration instead. Enter the duration, select the authorised member and add a specific note. This fictional example uses thirty minutes solely to demonstrate the form. Save once, then open the new row to verify its stored note and time. For real delivery, enter only the time actually worked and review billing eligibility separately.

18:56 Save and reopen manual time Choose Save to store the manual entry. Reopen Timesheets if the panel has closed, then use the new row’s edit icon to review its dates, member and note. Confirm the stored training details and cancel the review when no further change is needed. Check the duration in the table before including time in any draft invoice.

19:30 Edit the manual timesheet Choose Edit on the manual training entry. Review the start, end, member and note before saving a correction. This example is changed to a clearly labelled fictional forty-five-minute entry from nine to nine forty-five. Save, reopen the row and verify the stored times and note. Check the table’s duration and confirm the original timer entry remains unchanged.

20:11 Remove the training timer Review the timesheet row before using Delete. This example removes only the short timer recorded for the demonstration and keeps the separate forty-five-minute manual example. Confirm the selected deletion, reopen Timesheets and verify the remaining row. For real work, check the record and billing state before deletion. Removing time is separate from stopping a running timer.

20:44 Edit a checklist item Open Options beside the intended checklist step and choose its edit control. Update the wording so the owner can verify a clear outcome, then save and check the stored label. This example changes the preparation step to Review the demonstration scope and task brief. Keep completion separate from editing the wording. Review existing copies and saved templates separately when their wording also needs a change.

21:17 Reorder checklist items Use Options beside a step to move it up or down within its checklist. Review the intended sequence before changing it. We will move the scope-review step down to demonstrate the control, then restore it before the attachment check. Check the final order and completion boxes. Reordering the steps does not mean the work has been completed.

21:46 Remove an unused item An unnecessary step can be removed from its own Options menu. For this demonstration, add a clearly labelled optional training check, review its label, then remove only that step. Confirm the action if prompted and reopen the task to verify the original checklist remains. Review the scope before removing a real work item.

22:13 Remove an empty checklist An empty, unused checklist can be removed without changing the delivery steps in the other stages. Add a clearly labelled optional training checklist, review that it contains no items, then choose Remove empty checklist. Confirm the action if prompted and reopen the task. Check that the two original stages and their steps remain. Review the scope before removing real workflow records.

22:44 Complete and hand over a stage Review the checklist outcomes before marking steps complete. The demonstration scope has been reviewed and the training file has been uploaded and checked, so mark those two preparation steps. Choose Complete stage when its items are done. Check that the next stage becomes Ready for its owner. Completing a checklist stage is separate from completing the whole task.

23:20 Complete the final stage Review the training brief and the final checklist outcome. Mark the review step only after that check, then choose Complete stage. Confirm that both checklists show complete. The task itself remains a separate record with its own completion action, so completed checklist stages do not by themselves mean the task has been marked complete.

23:48 Reopen a checklist stage Use Reopen checklist when a completed stage needs another review. Check the item states again and clear the review step while reassessing it. After the training result has been checked, mark the step and complete the stage again. Verify that the earlier stage is preserved and both stages return to complete. Use this workflow to keep changes and review responsibility clear.

24:19 Complete a task and unlock work Once the required checklist stages and task outcome have been reviewed, use the task’s completion button. Verify the task status changes to Complete. This is the separate task-completion action, following the checklist work. It does not send an invoice or take a payment. The demonstration uses fictional delivery records throughout.

Close the completed task and open the delivery-review task. Its prerequisite selection remains saved, but the waiting condition clears because the required task is now complete. Check that the first checklist stage is Ready while the delivery task itself remains Not Started. This separates prerequisite readiness from someone actually starting or completing the next task.

25:12 Select billable task time Choose Invoice Project and review how eligible work will be grouped. The options are Single line, Task per item and All timesheets individually. This example keeps Task per item. Expand the task list and check that only the completed training task is selected. Review its logged time before continuing to the invoice form. The time and rate are illustrative; no payment has been taken.

25:44 Save the invoice draft Review the customer, addresses, dates, currency, payment modes and tax choices. This example contains forty-five minutes at seventy-five pounds per hour, totalling fifty-six pounds and twenty-five pence. Keep recurring invoices set to No. Add a clear training note and disable overdue reminders for this demonstration. Review the values before choosing the appropriate save action.

Choose Save as Draft. This stores the invoice for review without sending it to the customer. Verify the saved invoice is marked Draft and check its total on the project’s invoice list. Sending, recording a payment and changing invoice status are separate workflows. This demonstration does not send the invoice or request a real payment.

26:41 Open the project invoice draft Open Sales, then choose Invoices. Select the saved draft to open its invoice screen in a new tab. The project keeps a link to the same invoice; opening it does not create another record. Review the status and amount before sending anything to a customer.

27:04 Review draft invoice history Check the Draft status, customer and total of fifty-six pounds and twenty-five pence. Open Activity Log to review how the record was created, then return to Invoice. Review the itemised work and fictional training note. This example uses forty-five minutes at seventy-five pounds per hour. Leave the demonstration in Draft; sending an invoice and recording payment are separate actions.

27:34 Search, sort and export tasks Use the task search to find a specific piece of work. Enter Review onboarding workflow and check the matching row. Clear the search to restore the project list. Select a column heading to change the sort order, then review the task status, dates, assignee and priority together.

Choose Export to review Excel, CSV, PDF and Print. Select CSV for this example. Check the exported rows against the tasks displayed in the project. An export is a working copy for authorised review; it does not change a task or its status.

28:29 Bulk-tag selected tasks Select the two review tasks, then choose Bulk Actions. Check the selection before making a change. Add the Module review tag and leave the other fields unchanged. Keep Mass Delete unselected. Confirm, then review the resulting rows. Bulk actions apply the chosen changes to the selected tasks, so verify both the selection and the values each time.

29:00 Review and export timesheets Open Timesheets to review time recorded against this project. Check the member, task, start and end times, note, and both duration formats. The training entry is forty-five minutes, or zero point seven-five hours. Billed means that this time is linked to an invoice. Our invoice remains a draft; that label does not mean payment was received.

Search the project timesheets for the relevant task, then clear the search to review the complete list. Choose Export and select CSV. Check the exported entry against the screen before using it in an authorised report. Search and export do not start a timer or create another time entry.

29:54 Milestone views Open Milestones to see how tasks are grouped into delivery stages. Clear Exclude Completed Tasks to include the completed checklist task in the review. Use the view switch to compare the board with the milestone list, then return to the board. Check each stage’s dates and logged time. The filter changes what you see; it does not reopen a completed task.

30:27 Gantt scales and filters Open Gantt to review the project schedule visually. Change the scale from months to weeks, then days, to inspect the delivery window. Dates come from the saved milestones and tasks. Choose a scale that makes the relevant period readable before discussing progress or deadlines with your team.

Use the grouping control to review work by Members or Status, then return to Milestones. Select In Progress to focus the chart on active work, and restore All afterwards. These controls change the chart view. Check the underlying task record before changing its dates, owner or status.

31:33 Upload a project file Open Files to keep project documents with the delivery record. Review Visible to Customer before uploading. This training document starts private. Select the upload area, choose the delivery plan and wait for its row to appear. Confirm the filename and visibility before sharing it with a customer.

Return to Tasks, then reopen Files to confirm that the document remains saved. Review its uploaded-by and date information along with the filename. Project files and task attachments are separate locations: use the location that matches the work, and check customer access before making either visible.

32:26 Download the project document Select the filename to open its file details. Preview availability depends on the file type. This text document shows No preview available, so choose Download. Check the downloaded content against the document you intended to attach. Close the details when finished. The project keeps the same saved file; downloading it does not create another attachment.

32:54 Create an internal discussion Open Discussions and choose Create Discussion. Give the topic a clear subject and describe the decision or next step. Clear Visible to Customer for this internal training review. Save once, then confirm that the subject appears in the project’s discussion list.

Reopen the project discussion list and select the saved subject. Review the topic before adding a response. Keep discussion visibility aligned with the intended audience; an internal delivery review is separate from a customer-facing request or approval.

33:57 Reply to the discussion Write a concise response in the discussion editor and choose Send. State the outcome and the next action clearly. Reopen the discussion to verify the response and comment count. This topic is internal to the project team; customer visibility was disabled when it was created. Use discussion replies to keep the delivery conversation with the project.

34:35 Create a personal note Open Notes and choose New Note. Enter a clear title and write the reminder in Note Content, then choose Save note. Return to Notes to confirm that it was saved. Personal notes support your own project review; use the appropriate discussion or delivery workflow when a response from someone else is required.

35:31 Edit and remove the note Select the note’s edit control, update its title and content, and choose Save note. Reopen Notes to verify the saved wording. Use a clear subject so that the reminder remains easy to identify when reviewing the project later.

When a personal note is no longer needed, identify the correct row and choose its delete control. Confirm the deletion once, then reopen Notes to check the result. Here we remove only the clearly named training note. The project, tasks, files and discussion are preserved.

36:59 Expense categories An expense needs a category. If this workspace has none, open Setup, Finance and Expenses Categories. Choose New Category, enter a clear Category Name and describe its use. Save, then check the category list. This example creates Training costs for fictional walkthrough entries. A category organises expenses; it does not record a payment.

37:45 Record the project expense Open Sales and Expenses, then choose Record Expense. Enter the Name and Note, select Training costs, and review Expense Date, Amount and the customer. Use the currency shown for this customer. This fictional example uses twelve pounds and fifty pence. Leave Billable off for an internal training cost and review the tax fields.

Check the reference and Payment Mode before Save. A genuine receipt can be attached when needed. This example has no actual purchase or receipt. Save the demonstration entry, reopen the project’s Expenses list and verify its category, amount, date and reference. Recording an example expense does not make a bank payment.

39:45 Customer file visibility Use the file’s Visible to Customer switch to share the reviewed training plan with the project customer. Reopen Files and check that the switch remains on. File visibility and the contact’s project permissions work together. Enabling visibility does not email the document; emailing a file is a separate action.

40:19 Private task comment Open the correct task and review Comments. Select the comment box to open its editor. Write the next action clearly so that the task’s delivery context remains easy to follow. This example is a private, non-billable training task.

Choose Add Comment, then close and reopen the task to verify the saved response. Check the message in its task context before moving on. Keep customer-facing requests in the appropriate authorised project discussion or delivery workflow.

41:01 Create a task reminder Use the plus control beside Reminders on the correct task. Choose Date to be notified, confirm Set reminder to, and describe the follow-up. This example uses an in-app reminder for James Bennett. Leave the email option off when no email is required.

Choose Create Reminder, then close and reopen the task. Check the saved description, date and responsible member. Use the workspace’s configured time zone when setting a reminder. This training reminder will be removed after the demonstration.

41:46 Edit and remove the reminder Select the reminder’s edit control. Update the notification time and description, keep the responsible member unchanged, and choose Save. Reopen the task to check the revised reminder. Review the email option separately; it remains off in this example.

Identify the reviewed training reminder and choose its delete control. Follow the confirmation prompt and reopen the task to verify that the reminder is gone. We remove this example before its scheduled time. The task, project and other customer or lead reminders are preserved.

42:43 Save a task repeat schedule Open Actions and Edit, then review Repeat every. Choose 1 Month for this example. Clear Infinity and set Total Cycles to one. Check the task’s dates, project and visibility before saving. The repeat setting schedules future copies; it is separate from copying a task immediately.

43:18 Remove the repeat schedule In the task’s Edit form, open Repeat every and select the blank first option. The control returns to Nothing selected. Choose Save to return this training task to one-off work. Next, reopen the saved task and check that the repeat setting remains cleared.

43:45 Verify the one-off task Open the saved training task from the project list, choose Actions and Edit, and check Repeat every. Nothing selected confirms that this task has no repeat schedule. Review its existing project, dates and visibility settings as well. The three original project tasks remain in the list.

44:09 Private delivery draft Open Submissions to keep deliverables, reference notes and client decisions together. New drafts remain private to the project team. Enter a clear submission title and a description of what is ready for review. This fictional delivery pack demonstrates the setup; it does not represent actual client work.

Add reference notes and any relevant supporting links. Attach only documents intended for this delivery record, then choose Save draft. Reopen the saved draft and verify its title, description and attachments. Submit to client is a separate action; use it only after checking the recipients and the contents.

45:01 Reopen the delivery draft Return to Submissions and open Training delivery pack from the records list. Check the saved draft status, reference notes, supporting link and encrypted attachment. The audit trail records the draft creation. The notification counters remain at zero because this draft has not been submitted to the client.

45:27 Save a task filter Use Filters to focus a busy task list. Choose New Filter, then add a Status rule and select In Progress. Enable Save Filter and give the view a clear name. Review sharing and default settings before choosing Apply and Save. This training filter remains private and is not the default view.

46:07 Reuse and clear the filter Open Filters again and select Training - In-progress tasks. The list shows only the matching training task. A filter changes the view; it does not remove other records. Use Clear Filter to return to the full list and verify that all three project tasks are still present.

46:31 Change a task milestone Open the task’s current milestone and choose the required delivery stage. Here, move the private training task to Delivery review. Check the saved milestone label and the existing task dates. Changing this grouping does not replace the task’s own start and due dates.

Use the same milestone control to return this training task to Client brief. Reopen the task from the project list and check the saved milestone again. Its checklist stages, dates and private visibility remain in place. In normal work, choose the milestone that matches the task’s agreed delivery stage.

47:19 Detailed task overview Choose Tasks Overview to review the project’s tasks together. The report shows dates, status, attachments, comments and logged time. Filter by team member, month, year and task status. Select Complete and choose Filter to inspect the finished task and its saved forty-five-minute training time entry.

Change Status back to All and choose Filter again. Verify that the completed, in-progress and not-started training tasks are all present. Use this view to review delivery progress, then open a task to inspect its detailed checklist stages, supporting files and comments.

48:14 Move a task on Kanban Choose the Kanban view button to group project tasks by status. Drag the private training task from In Progress to Testing. Reopen the project list and board to verify that the stage was saved. In live work, move a task only when its actual delivery stage and required checks support the change.

48:48 Verify the restored task status Return the training card to In Progress, then reopen the project list to verify the saved status. The other tasks remain Not Started and Complete. Kanban updates task status; checklist stages, project milestones and the overall project status are reviewed through their own controls.

49:34 Update project status Project status is separate from individual task status. Open More and choose Mark as In Progress. Review the additional actions before confirming. Leave member notifications and completion of all tasks off for this example. Confirm, then reopen Overview to verify the saved project status.

50:12 Pin and unpin the project Open More and choose Pin Project to keep a frequently used project easy to reach. Reopen More after the page refreshes. The action changes to Unpin Project, confirming that the project is pinned for this staff account. Pinning does not change the project’s delivery status or its customer permissions.

Choose Unpin Project to remove this training project from the pinned shortcuts. Reopen More and check that Pin Project is available again. The project remains In Progress and its saved tasks, time entries, files and permissions are preserved.

51:24 Activity and linked records Open Activity to review dated changes and the colleague who made them. Review each Visible to customer switch as well as the project’s permissions. The label is present beside both enabled and disabled switches; check the actual switch state before deciding what the customer can see.

The project also links to Tickets, Contracts and Sales records. Open the relevant section to review its records in context. In this training project, Tickets and Contracts are empty. Sales contains the saved invoice draft; its draft status does not represent a sent invoice, a payment or actual work.

Return to Overview, open More and choose View project as customer. The authorised preview opens in another tab. Review it as the intended customer, checking which tasks, milestones, files and discussions are available. Staff-only work and private drafts should be assessed from this customer perspective before sharing a live project.

53:11 Customer activity privacy Activity visibility is configured separately from a milestone or invoice record. Before sharing the project, review each event’s Visible to customer switch. Turn it off for the private training milestone and the unsent invoice draft. The events remain in the staff activity history, while their customer visibility is removed.

Return to Overview and reopen Activity. Check that both selected switches remain off and that the staff events are still present. Then review the signed-in customer account again. Keep suitable progress updates visible, and assess the activity trail alongside the project’s other customer permissions.

54:06 Signed-in customer access After the contact signs in privately, review the actual customer portal. Project sections follow contact permissions and project settings. Open Tasks and Milestones to check the customer-visible work. In this example, the completed task and Client brief milestone are available; the internal review tasks and milestone remain hidden.

Open Files to confirm that the approved project delivery plan is available. Then review Discussions and Submissions. The internal discussion is not shared, and the private delivery draft is absent from customer review until it is submitted. Check these sections using the intended contact’s own account.

Return to the project and open Activity to review the customer’s update trail. Financial and timesheet sections are absent because those permissions are off. Review the actual customer account after changing permissions, and distinguish overall project progress from the tasks that the customer is allowed to see.

55:58 Copy the project Open More and choose Copy Project. Review the tasks, checklist items, assignees, followers, milestones and members options before copying. For this demonstration, turn those options off so the temporary copy contains no delivery records. Enter a distinct project name and choose the intended customer and dates.

Check the name, customer, dates and unchecked copy options, then choose Copy Project once. Open the copied project’s Tasks and Files sections to confirm that no delivery work or documents were copied. Keep the source project intact. This clearly named temporary copy will be removed in the next chapter.

57:31 Delete the empty training copy Check the project name before using Delete Project. This example removes only Temporary project copy, whose tasks, files and financial lists were verified empty. Open More, choose Delete Project and read the confirmation. After deletion, check that the original Willowbrook onboarding project remains available.

57:54 Verify the original project The temporary copy has been removed. Reopen Willowbrook onboarding from the project list and check its In Progress status. Review Tasks and Files to verify that the three original tasks and the delivery plan remain saved. Removing the empty copy has preserved the source project and its delivery records.

58:29 Export the project PDF Review the project name and saved task list before exporting. Check that you are working with the intended customer and project. The original training project still contains three tasks. Return to Overview, then use More to find Export project data. This action produces a PDF project report.

Open More and choose Export project data. The application generates the project report as a PDF in another tab. Check its filename and contents before downloading or forwarding it. The report reflects the saved project records at the time of export; this example contains fictional training data.

59:23 Summary and next steps You have followed the project from customer details and permissions through milestones, tasks, checklist handovers, files, discussions, time tracking and draft billing. You have also reviewed customer access, saved delivery drafts, activity visibility, project copying and the PDF export. Use the feature chapters to return to a specific workflow. In your own workspace, check the saved result after each change and confirm the intended customer access before sharing delivery work.

Recorded in the live Britixo application using a disposable workspace and fictional training records. Available actions depend on your role, enabled modules and authorised integrations.

14 guides
Guide

Create a project

Set up a customer project with dates, billing type, members, progress and visibility options.

Open guide →
Guide

Configure project members and permissions

Choose the staff who can access and work on the project.

Open guide →
Guide

Create and manage project milestones

Break delivery into ordered stages with due dates and visual status.

Open guide →
Guide

Use project overview and progress

Review project health, tracked time, tasks, milestones, financials and recent activity.

Open guide →
Guide

Use the project Gantt chart

Visualise task dates, dependencies and delivery sequence on a timeline.

Open guide →
Guide

Manage project files and client visibility

Upload internal or client-visible files and update file descriptions.

Open guide →
Guide

Use project discussions

Create threaded project conversations and control client visibility.

Open guide →
Guide

Record project expenses

Create project-related costs and mark eligible expenses billable to the customer.

Open guide →
Guide

Create a task

Define work with assignees, followers, dates, priority, relation and description.

Open guide →
Guide

Use task list and Kanban views

Filter tasks, change view and move work through statuses.

Open guide →
Guide

Use task checklists and attachments

Break work into verifiable steps and keep supporting files with the task.

Open guide →
Guide

Track time with task timers

Start, stop, edit and review time entries while respecting permissions.

Open guide →
Guide

Create billable task time on an invoice

Select eligible unbilled time and convert it into invoice line items.

Open guide →
Guide

Copy tasks and manage recurring tasks

Reuse task structures and automate repeat work without duplicating setup manually.

Open guide →

Practical workflow guides

Use these focused guides alongside the detailed instructions in this section.