Start a renewal from an approved onboarding pack
Use the dedicated renewal path for an approved and locked onboarding pack.
Where to goProperties Management → Requests & Applications → Onboarding workspace → approved pack → Renewal
Before you start
Use tenant Edit and the existing onboarding within your authorised property scope.
Follow these steps
- Open the approved pack and verify its property, parties and linked agreement.
- Choose Renewal from the post-approval controls.
- Check the property and tenant in the new renewal onboarding context, then review the proposed terms.
- Complete the required agreement and signing stages before treating the renewal as complete.
Fields, rules and limits
- Renewal is a post-approval action and is unavailable before the pack is approved and locked. It starts a new renewal onboarding flow carrying the source onboarding, property and tenant context; it does not silently replace the signed agreement.
Check it worked
Reopen the source record and verify its reference, saved state and linked evidence.
If something does not look right
Check the required permission, current workflow state and exact validation message before retrying.
Questions and answers
Does this action replace the original evidence?
No. Check the linked source record and its original evidence separately; the saved result describes the task performed here.
What should I do if the action fails?
Read the validation message and reopen the record before retrying. Correct the relationship or state that caused the failure.
