Task report criteria

Use the rolling 3-month task period

Apply the 3 Months period using the selected task date basis.

Audience: CRM staff and administratorsPermission: Advanced Task Filters: ViewModule v1.0.4
Exact navigationAdmin Area → Task Filters → Task Filters
Before you begin
  • Confirm the module is active and use the exact navigation shown above.
  • Use an account with the stated module and core CRM permissions.
  • Use known test records when changing statuses, visibility, saved filters or global navigation.

What this guide covers

Apply the 3 Months period using the selected task date basis. The instructions below follow the supplied module’s live menu, controller, form, model and JavaScript flow.

Exact step-by-step process

  1. Open the task report.
  2. Under Filter By Date, choose Start Date or Completed Date.
  3. Under Period, choose 3 Months.
  4. Apply the filter.
  5. Verify boundary records around the first and last included dates.

Fields, choices and supported possibilities

Filter By DateStart Date or Completed Date.
Period3 Months

Code-backed validations and workflow rules

  • Starts on the first day two months before the current month and ends on the final day of the current month.
  • The date condition applies to the selected date-basis field, not both date fields.

Expected result and verification

  • Use the rolling 3-month task period completes without a validation or permission error.
  • The refreshed report, menu or saved-template page shows the expected state.
  • A second authorised user sees only the records and navigation allowed by their core CRM permissions.

Security, privacy and operational checks

  • Test changes with a non-production record or a controlled administrator account before wider rollout.
  • Do not use navigation visibility as a substitute for core CRM record permissions.
  • Confirm the CRM timezone before validating Today, week or month boundaries.